Meeting Recording
Agenda
Your Feedback
What has your OCN connection experience been like?
What can we do to improve the OCN connection for new companies with limited technical resources?
OCN Bridge
OCPI 2.1-2.2 Bridge
OCN “Gateway” (2.2-2.2 Bridge)
including key storage and signing
free SaaS offering for joint projects, demos and POCs
CPOs on the OCN
Lama.zone
310 AC charge points at 37 different locations across Germany
in 2022: 440 AC charging points
3 charge points connected and available for testing in joint projects
2 charge points in Stuttgart
1 in Berlin
Remaining charge points going live on the production network in early 2022
Add Comment